Conflicting advice on levelling and turfing my lawn.
Hi all
I have a garden that is about 20' by 35'. I have recently turned it with a rotorvator and have invited 3 different quotes. All 3 have said diferent things and quoted different prices. Here are some facts: The garden slopes down from the back towards the house. The incline is not that great (A football would probably not roll down it) Of the first quote I had, the gardener told me: "You'll need about 3 ton of top soil to level it off. Then we'll put top quality turf down". I know this guy as a freind and he seems very nice and honest. Price is £550 2nd firm told me "You'll need a skip to get rid of a lot of that soil so we can get it level before we turf it". Price £350 3rd Guy (one man band) "It'll be £250 all in" Why the difference in price? Why does 1 firm want to add soil, and 1 take it away in a skip. Please help. I'm confused. |
All times are GMT +1. The time now is 09:26 AM. |
Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
GardenBanter