On Mon, 28 Jun 2004 22:47:24 +0100, "Al Reynolds"
wrote:
(1) Do I fit the post to the metpost, and then knock it
into the ground, or do I put the metpost in the ground
and then knock the post in?
(2) Do I fit the arris rail clips to the arris rail, and then
nail them to the posts, or do I fit the clips to the posts
and then nail to the arris rail?
Also, does anyone know if you can buy a "water level"
or do you just make one up out of some clear tubing?
Thanks in advance,
Al
--
Peter Parry.
http://www.wpp.ltd.uk/