View Single Post
  #8   Report Post  
Old 12-01-2005, 05:40 PM
Lt. Kizhe Catson
 
Posts: n/a
Default

~ jan JJsPond.us wrote:
What changes or additions are you thinking about next year?

If I win the lotto...... No, real changes. (Not make-believe changes to go
with your make-believe anti-spam e-mail addresses. ;o) ~ jan


~Power to the Porg, Flow On!~


Plan for spring/summer 2005:

Dig/line/fill pond #2. This is to be ~6'x6', on the shady side of the
sunroom, right under the edge of it, so when you're in the sunroom it
looks like the water goes right underneath you (but the overhang is
actually only about 4"). Surrounding landscaping to include some of the
monster rocks they dug out to do the sunroom footings (levering them in
to place will require some....leverage. In a family full of engineers,
this is what we do for fun ;-). Then, general cleanup and repair of the
backyard from the construction damage. Goal: naturalized "forest floor"
kind of look.

-- Kizhe