"Stuart Meier" wrote in message
...
Cormaic (he of this list!) to the rescue:
http://www.pavingexpert.com/concmix1.html. First select your mix....
Looks to me like you will want nearly TWO tonne bags of ballast, and the
10
bags of cement. So, as Grunff would say a VERY long day. (In fact, I did
tow
tonne bags worth of strip filling in roughly 3 very very hard hours, on me
tod, running with the barra.)
--
Stuart
"Grunff" wrote in message
...
Rab Simpson wrote:
Anyone know what materials I need to mix approx 1 cubic mtr concrete
for
strip found.
Approximately a dumpy bag of ballast, 10 bags of portland
cement, plenty of water, a cement mixer, and a long day.
--
Grunff
Thanks guys, my first flush of youth is long gone so I will probably take
about three days but I have plenty of time anyway.
There are steps in it anyway so I can always do it a step at a time &
overlap each step by a bit for the joins.
What proportions cement, sand, chips do I use for each mix in a 25 litre
mixer.
Cheers, Rab.