Finishing mine. main digging is done, need to slope bottom for bottom drain,
level perimeter for footings. Pour footings, build block walls 5ft high,
install TPR's, skimmer. Dig a hole for a 400 gallon settling chamber, dig
filter pit, put liner in hole & fill.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -