Thread: Dig date
View Single Post
  #1   Report Post  
Old 08-04-2004, 11:33 PM
pmwebdesigns
 
Posts: n/a
Default Dig date

Hi Everyone!
Well I'm off of work tomorrow and all next week for spring break.
I start digging my hole in the morning.
15x15 and 4 ft deep.
I'm go put in two bottom drains with pipe boots that feed into a settlement
hole in back of the pond that I'm looking at being around 4ft deep and 3x6
long, then this will go into a veggie filter with filter mat back into the
pond.
I want to have a venturi in there also.
I am getting rather excited although I hate the thought of all that digging.
I'm go be one sore woman. It'll probably take a week to dig all that.
Priss
http://priss31.tripod.com/SmallPond.html