In a construction project, you generally will pay far less for materials
than for the labor and expertise of installation. How much time will this
take? Do you know what the costs are for taxes, insurance, contractors
license, vehicles, wages. Not getting an itemized estimate may be for the
bidders ease, or to prevent people from using a bid as a free design service
so they can then go to Lowes and do it themselves.

Get more bids.

"macglade" wrote in message
ink.net...
I just received a bid for a landscaping project which includes 840 sq ft

of
lawn. I was quoted $700 PER VALVE installed. Since he does not itemize

PVC
and connectors (although they must be very cheap) I assume they are

included
in this. I have not discussed yet with the bidder. A couple of

questions:

Are the valves those units which sit on top of all the vertical pipes and
control electronically the release of water, based on signals from the
controller (which I was quoted $350 for)?

I've checked prices on the web and they range from $20 to $350.

The $700 strikes me as VERY high. Now, I live in Northern California

where
a dumpy 40 yr old 3 BR 1 1/2 Bath ranch (1700 sq ft) on 1/4 acre goes for
$1MM (no kidding) so I'm (sadly) used to outrageous prices. But this

seems
beyond the pale.

Am I getting ripped off?

By way of comparison, other items were priced at: $20 per facing feet of
dry stacked stone wall or pressure treated wood, sod at $1 per sq ft,

French
drain installed at $10 per linear feet

Thanks in advance












----== Posted via Newsfeeds.Com - Unlimited-Uncensored-Secure Usenet News==----
http://www.newsfeeds.com The #1 Newsgroup Service in the World! 100,000 Newsgroups
---= East/West-Coast Server Farms - Total Privacy via Encryption =---