View Single Post
  #5   Report Post  
Old 18-02-2003, 09:43 PM
trevor.appleton
 
Posts: n/a
Default Propagation Bench construction

through, then 2 inches of sand cable laid 6 inches apart then another 2
inches then black poly over that to keep the moisture in the sand


1 " or 2" polystyrene?

Sand or grit?

Sharp or soft sand?


---
Outgoing mail is certified Virus Free.
Checked by AVG anti-virus system (http://www.grisoft.com).
Version: 6.0.455 / Virus Database: 255 - Release Date: 13/02/03