LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old 08-10-2004, 02:39 PM
JD
 
Posts: n/a
Default brick patio question

I am going to build a large brick patio ( 350 sq ft). Since I will only be
able to work on it during weekends. I was planning on doing it in sections.
My thoughts are to excavate the entire area, then pack my base and then put
up screed boards for the sand & leveling. I was going to do it in sections
and leave the screed boards buried in the sand and not remove them. If I
use treated 1x4 it will take quite a while for them to rot. Does anyone see
a problem with doing this? Is there another way to do this in sections over
6-8 weekends?
Thanks
JD


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Brick patio: weeds out of control Mitch Lawns 4 14-07-2007 05:14 AM
raised bed on patio brick [email protected] Gardening 12 03-06-2006 01:20 PM
Jane finds her garden:brick wall question Jane Lumley United Kingdom 50 05-12-2003 09:34 PM
Jane finds her garden:brick wall question Jane Lumley United Kingdom 0 29-11-2003 07:17 PM


All times are GMT +1. The time now is 12:52 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 GardenBanter.co.uk.
The comments are property of their posters.
 

About Us

"It's about Gardening"

 

Copyright © 2017